Demonstration site by TelecomGrowth. The company is fictional. Back to our work

Full-fibre + 5G · Nationwide

Light-speed,
delivered.

Your street. Our fibre. Photons doing 200,000 km a second, ending at your sofa. Nordvia is broadband engineered like an instrument — and priced like it isn't.

LATENCY 9ms PEAK 2.3Gbps UPTIME 99.99% HOMES PASSED 1.4M

The journey

Follow the light.

Scroll. This is the eleven-millisecond life of a single frame of your video call.

  1. 01 The exchange

    Your frame leaves a core node — one of 34 across the country, each with dual power feeds and dual fibre exits. Nothing here has a single point of failure.

  2. 02 The backbone

    It rides our own dark fibre at two-thirds the speed of light in glass. No leased congestion, no peak-time queueing. The route is ours end to end.

  3. 03 The street cabinet

    Except there isn't one. Full fibre means no copper cabinet slowing things down on the corner — the glass runs straight past it, unbroken.

  4. 04 Your home

    The light terminates at the Nordvia Hub on your wall. Total journey: nine milliseconds. You blinked slower than that.

0ms
Median latency
0.0Gbps
Top download speed
0.00%
Network uptime, 12 mo

Coverage

Is the light on your street?

1.4 million homes passed and climbing. Enter your postcode — we'll sweep the grid.

Scanning fibre routes near you…

You're covered. The light reaches your street. Estimated line speed: 2.1 Gbps · install from 5 working days
Choose a plan

Plans

Four speeds. One signal quality.

Every plan runs on the same glass, the same core, the same 9 ms. You only choose how wide to open the tap.

Trace

150 Mbps ↓ · 150 Mbps ↑

£24/month

  • Full fibre to your door
  • Symmetric upload
  • Nordvia Hub included
View plan

Beam

500 Mbps ↓ · 500 Mbps ↑

£29/month

  • 4K streams on every screen
  • Wi-Fi 7 hub
  • No mid-contract price rises
View plan

Zenith

2.3 Gbps ↓ · 2.3 Gbps ↑

£55/month

  • Our fastest residential line
  • Priority support line
  • Static IP included
View plan

Why Nordvia

Built like an observatory.
Run like one, too.

Symmetric by default

Upload as fast as you download, on every plan. Cloud backups, streams and calls stop being second-class traffic.

9 ms, measured hourly

We publish median latency from 40,000 live probes. Not a lab figure — the network as it actually is, right now.

No mid-contract rises

The price you sign is the price you pay, for the whole term. In writing, in the contract, in plain English.

5G when you leave

Bundle a Nordvia 5G SIM and your connection follows you out of the door. One bill, one network, zero handover fuss.

Signals received

People notice the quiet.

No buffering wheel. No 7 pm slowdown. The absence of annoyance is the product.

★★★★★ I stream, my partner raids, both kids are on video calls — and the line doesn't even flinch. Switching took one afternoon and one cup of tea.
Elena M.Aurora · Manchester
I edit video for a living and push 200 GB to the cloud most weeks. Symmetric upload changed my working day. I finish while the old me would still be watching a progress bar.
Daniel O.Zenith · Bristol
★★★★★
Their status page told me about the only outage before I noticed it. Eleven minutes, honest post-mortem published the next day. That's how you keep a customer for life.
Priya K.Beam · Leeds
★★★★★

Questions

Short answers. Straight ones.

Is it really full fibre, all the way to my house?

Yes — FTTP, fibre to the premises. The glass runs unbroken from our exchange to a small termination point on your wall. No copper, no street cabinet bottleneck, no "fibre" asterisks.

What happens on installation day?

A Nordvia engineer runs the fibre from the nearest access point to your home, fits the wall unit and the Hub, and stays until a speed test on your own device confirms the plan you're paying for. Most visits take under two hours.

Do I need a phone line?

No. Nordvia is a pure data network. If you want a home phone, add Nordvia Voice for £4/month — your existing number ports over and calls run over the fibre.

What if I'm in contract with another provider?

Under One Touch Switch we handle the change for you — you never contact your old provider. If you're mid-contract, we'll credit up to £120 towards early-termination fees on 24-month plans.

Is there a setup fee?

Standard installation is free on every plan. A non-standard build (long private driveway, listed building consents) is quoted before any work starts — and you can walk away at no cost.

The light is probably
already on your street.

Thirty seconds to check. Five days to install. A decade of not thinking about your broadband.

Check your postcode